Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.
Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.
Photograph of municipal maintenence building under construction in the Service Centre. Framework and brickwork in progress. Men on roof working. Truck parked out front. There is some water pooled in front as well.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of municipal maintenence building under construction in the Service Centre. Framework and brickwork in progress. Men on roof working. Truck parked out front. There is some water pooled in front as well.