Photograph of gully crossing #2 showing the clearing contractor placing the dead and diseased trees at the base of the gully to stop any further earth slippage and improve the appearance of the area. Houses visble on hill behind.
Land clearing of Kitimat. All aerials for development.
Custodial History
From the files of Ray Hunstone. Photos from an Alcan binder, have Alcan numbers.
Scope and Content
Photograph of gully crossing #2 showing the clearing contractor placing the dead and diseased trees at the base of the gully to stop any further earth slippage and improve the appearance of the area. Houses visble on hill behind.
Photo showing the path to the Kitimat water supply. The water tower can be seen up near the top of a hill in the photo with the path flanked by trees. The pathway is made of a wooden ramp and there is a long hose coming down from the tower with at least two People seen at the towers base.
Photo showing the path to the Kitimat water supply. The water tower can be seen up near the top of a hill in the photo with the path flanked by trees. The pathway is made of a wooden ramp and there is a long hose coming down from the tower with at least two People seen at the towers base.