N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
Photo depicts two workers looking on as a Sikorsky S-55 helicopter brings in a load of supplies to the transmission line camp atop Kildala Pass.
Notes
Photographed by the International Harverster Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.82
Photograph of the erosion around the ends of the temporary weir in the main channel beside the Baptist Church. Baptist Church is to the right. Some homes visible in background.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of the erosion around the ends of the temporary weir in the main channel beside the Baptist Church. Baptist Church is to the right. Some homes visible in background.