N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
Negatives showing the earliest construction for the Eurocan Pulp & Paper Mill. Clearing of land and construction of dirt roads can be seen.
Notes
**IMPORTANT NOTE** - Negative slide sleeves are labelled as 2004.16.* , where * represents the item number in each series.
80001, 80003, 80004, 80006, 80011, 80013, 80017, 80045, 80047, 80052, 80054, 80058
Photograph of the clearing contractor's men drilling a tree stump in preparation for blasting. Note how the chain saw has been modified for drilling purposes.
1 photograph : b&w ; 12.7 x 17.7 cm
1 negative : b&w ; 35 mm
Scope and Content
Photograph of the clearing contractor's men drilling a tree stump in preparation for blasting. Note how the chain saw has been modified for drilling purposes.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing the state of some of the machines and structures for the Eurocan Pulp & Paper Mill after approximately two years of site construction.
Negatives showing the state of some of the machines and structures for the Eurocan Pulp & Paper Mill after approximately two years of site construction.