Photo showing six and a half feet tall beams that were transported by barge to Kitimat, then hauled by Saunders Trucking, to be installed by Commonwealth Construction.
Photo showing six and a half feet tall beams that were transported by barge to Kitimat, then hauled by Saunders Trucking, to be installed by Commonwealth Construction.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.