View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photograph of a view of the Alcan smelter. Photo is taken from up on a hill with fireweed. View is looking east. Eastuary is visible behind the smelter. Beyond that is the channel and mountains. Low mountains have sections of clearcut. Mount Elizabeth in background.
Photograph of a view of the Alcan smelter. Photo is taken from up on a hill with fireweed. View is looking east. Eastuary is visible behind the smelter. Beyond that is the channel and mountains. Low mountains have sections of clearcut. Mount Elizabeth in background.
Aerial photo of the Alcan aluminum smelter site, and the Douglas Channel. Taken from the north looking south. Note - bottom left corner is a portion of the Anderson Creek construction camp.
Aerial photo of the Alcan aluminum smelter site, and the Douglas Channel. Taken from the north looking south. Note - bottom left corner is a portion of the Anderson Creek construction camp.