Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Notes
Photo is in two parts and taped together in the middle.
Photograph 'Looking west, "Lotus Seeker" Clam Shell Dredge fitted with 1 3/4 c.y. grab commences to throw up North Bank for Graving Dock. Primary dig to obtain flotation, borrow pit to be dug down to zero level.'
Photograph 'Looking west, "Lotus Seeker" Clam Shell Dredge fitted with 1 3/4 c.y. grab commences to throw up North Bank for Graving Dock. Primary dig to obtain flotation, borrow pit to be dug down to zero level.'