Photograph of smeltersite looking east. Service building area in middleground with pre-cast wall panels in position. Pre-cast concrete yard in foreground.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of smeltersite looking east. Service building area in middleground with pre-cast wall panels in position. Pre-cast concrete yard in foreground.
Photograph of smeltersite looking east. Foreground, perforated concrete pipe for ground water ditch. Middleground, pre-cast concrete yard with storage stacks at right. Structural steel partially complete in service buildings lines D to M. Footings for pot line 2 at right.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of smeltersite looking east. Foreground, perforated concrete pipe for ground water ditch. Middleground, pre-cast concrete yard with storage stacks at right. Structural steel partially complete in service buildings lines D to M. Footings for pot line 2 at right.
Photograph of smeltersite looking east, showing partially completed service buildings at left and work proceeding on rectifier buildings in foreground. Temporary covers for the center passageway buildings can be seen beyond the west half of the pot rooms.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of smeltersite looking east, showing partially completed service buildings at left and work proceeding on rectifier buildings in foreground. Temporary covers for the center passageway buildings can be seen beyond the west half of the pot rooms.
Photograph of looking N.E. at storage building area of hydraulic fill showing west half of area filled to elavation 20 feet. Stripping sarted again in pond area at right centre.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of looking N.E. at storage building area of hydraulic fill showing west half of area filled to elavation 20 feet. Stripping sarted again in pond area at right centre.
Photograph of rectifier building #102, looking south, being prepared for concrete for second lift of walls and main floor slab. Note erection od Quonset at right for Canadian comstock.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of rectifier building #102, looking south, being prepared for concrete for second lift of walls and main floor slab. Note erection od Quonset at right for Canadian comstock.