Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection
The framework of the building with a crane lowering the last ceiling glue-lam beam into position while workers look on.
Notes
Title based on content of photograph. -- The Y.M.C.A. opened its doors in 1957. This lounge structure under construction is now the Community Room for the District of Kitimat Recreation Riverlodge facility. Alcan Collection 73.3.7.6
Title based on content of photograph. -- Haisla Bridge, Kitimat's first permanent bridge was completed by the end of 1953 and officially opened in 1957. -- The cost was over one million dollars. District of Kitimat Collection. District of Kitimat Collection 987.10.2
Photo depicts Philip ("Flying Phil") Gaglardi, B.C. Minister of Highways at the Hirsch Creek section, during construction of Highway No. 25, Terrace to Kitimat. View is looking towards Terrace.
Photo depicts Philip ("Flying Phil") Gaglardi, B.C. Minister of Highways at the Hirsch Creek section, during construction of Highway No. 25, Terrace to Kitimat. View is looking towards Terrace.
Notes
Title based on content of photograph. Photograph appeared in the Northern Sentinel, August 24, 1956. Northern Sentinel Press Collection No. 2005.8.695.