Construction happening at city centre with a huge hole beside the Bank of Commerce. There is also a lot of construction equipment. The area in front of City Centre mall is boarded off and out of limits. City Centre Mall expansion construction.
1 photograph : b&w ; 10.4 x 12.6 cm
1 negative : b&w ; 9.9 x 12.5 cm
Scope and Content
Construction happening at city centre with a huge hole beside the Bank of Commerce. There is also a lot of construction equipment. The area in front of City Centre mall is boarded off and out of limits. City Centre Mall expansion construction.
Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.
Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.