Photo depicts miners pouring the permanent crane rail beam along the upstream wall of the powerhouse's A-line. Seen is the special hopper mounted on one of the construction cranes.
Photo depicts miners pouring the permanent crane rail beam along the upstream wall of the powerhouse's A-line. Seen is the special hopper mounted on one of the construction cranes.
Notes
Title based on content of photograph. -- Alcan ID No. KR-1144. -- The special hopper is filled by the concrete pump mounted at the inner end of the access tunnel. Alcan Collection
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212