Photograph showing flood conditions of Kitimat River at Sandhill, Wednesday morning, 29th October. Note: leaning power poles in middle foreground, these were dislodged by floating debris.
Photograph showing flood conditions of Kitimat River at Sandhill, Wednesday morning, 29th October. Note: leaning power poles in middle foreground, these were dislodged by floating debris.
Photograph showing material being dumped to build up the roadverge at the Sandhill, the level of the River had dropped nearly one foot from the peak elevation when this photograph was taken.
Photograph showing material being dumped to build up the roadverge at the Sandhill, the level of the River had dropped nearly one foot from the peak elevation when this photograph was taken.
Photograph of view looking southwest from a point north of Kitimat terminal wharf #1 showing hydraulic dredge "townsend" at left, and the wharf Kangaroo Crane being erected at extreme right.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking southwest from a point north of Kitimat terminal wharf #1 showing hydraulic dredge "townsend" at left, and the wharf Kangaroo Crane being erected at extreme right.
Photograph of view looking east along roof of potroom building 1-A taken from a point on the conveyor gallery. Note roof exhaust fans operating during electrode baking operations.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking east along roof of potroom building 1-A taken from a point on the conveyor gallery. Note roof exhaust fans operating during electrode baking operations.
Photograph of view of Kitimat terminal wharf #1 looking south from a point on conveyor gallery C1 showing the alumina handling plant, and rail being laid on the wharf deck.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view of Kitimat terminal wharf #1 looking south from a point on conveyor gallery C1 showing the alumina handling plant, and rail being laid on the wharf deck.
Photograph of Miss Ardelle Auty (Cates), Grade 1 class, Nechako Elementary. Miss Auty is standing back left beside three rows of children, two standing, one seated.
Photograph of Miss Ardelle Auty (Cates), Grade 1 class, Nechako Elementary. Miss Auty is standing back left beside three rows of children, two standing, one seated.