Skip header and navigation

Revise Search

3 records – page 1 of 1.

Aerial - Ocelot Industrial Site - Partec Const Camp Foreground

https://collections.kitimatmuseum.ca/en/permalink/description27866
Part Of
Ocelot Collection
Description Level
Item
GMD
graphic material
Date Range
27 Feb 1981
Accession Number
982.66.15
Scope and Content
Ocelot Site - looking North (Note the lack of snow)
Part Of
Ocelot Collection
Description Level
Item
Accession Number
982.66.15
GMD
graphic material
Date Range
27 Feb 1981
Physical Description
1 photograph : b&w ; 25.5 x 20.6 cm
Scope and Content
Ocelot Site - looking North (Note the lack of snow)
Subject Access
Aerial
Ocelot
Ocelot Site
Industries
Construction
camp
Business
Storage Location
photograph storage

Ocelot Site - Looking N. W.

https://collections.kitimatmuseum.ca/en/permalink/description27955
Part Of
Ocelot Collection
Description Level
Item
GMD
graphic material
Date Range
5 Mar 1981
Accession Number
982.66.25
Scope and Content
Aerial view ocelot industrial site - Eurocan ; N. W. View.
Part Of
Ocelot Collection
Description Level
Item
Accession Number
982.66.25
GMD
graphic material
Date Range
5 Mar 1981
Physical Description
1 photograph : b&w ; 25.5 x 20.7 cm
Scope and Content
Aerial view ocelot industrial site - Eurocan ; N. W. View.
Subject Access
Construction
Ocelot
Ocelot Site
Industries
Aerial
Partec
camp
Eurocan
Business
Storage Location
photograph storage
Material Type
Virtual Exhibit
Description
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
  1 image     1 website  
Material Type
Virtual Exhibit
Description
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
Images
Websites / Virtual Exhibits