Photograph of view of Kitimat terminal wharf #1 looking south from a point on conveyor gallery C1 showing the alumina handling plant, and rail being laid on the wharf deck.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view of Kitimat terminal wharf #1 looking south from a point on conveyor gallery C1 showing the alumina handling plant, and rail being laid on the wharf deck.
Photograph of view looking east along roof of potroom building 1-A taken from a point on the conveyor gallery. Note roof exhaust fans operating during electrode baking operations.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking east along roof of potroom building 1-A taken from a point on the conveyor gallery. Note roof exhaust fans operating during electrode baking operations.
Photograph of aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.