Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.
Photo showing Carbon Paste Plant area looking north-east showing progress of deep foundations and start of building footings, compressor foundation and column footings for compressor building 140 in foreground.
Photo showing Carbon Paste Plant area looking north-east showing progress of deep foundations and start of building footings, compressor foundation and column footings for compressor building 140 in foreground.
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.