Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
Photograph showing an L shaped building in the foreground, industrial buildings in the bottom half of the photo and landscape and trees in the background.
Photographs taken by Gordon Lee donated to the museum by his daughter Michelle Simeoni.
Scope and Content
Photograph showing an L shaped building in the foreground, industrial buildings in the bottom half of the photo and landscape and trees in the background.