Photograph of Smelter Pot Lines. Back of photograph reads: "The buildings in the background are the 'pot lines'. Thes pictures were taken 4 months ago so everything has changed since then. The 'cat' in the centre is pulling a 50 ton roller.
Photograph taken by Dave Geddes, Bank of Montreal, and given to Sylvia Anderson
Scope and Content
Photograph of Smelter Pot Lines. Back of photograph reads: "The buildings in the background are the 'pot lines'. Thes pictures were taken 4 months ago so everything has changed since then. The 'cat' in the centre is pulling a 50 ton roller.
Photograph of Smelter Pot Lines. On back reads 'Pot Rooms One A,B,&C (r to l). These threee pot rooms comprise one pot line. There are two such pot lines nearing completion. When the project is completed there will be 8 pot lines or in other words 24 pot rooms, each 1200 feet long.'
Photograph of Smelter Pot Lines. On back reads 'Pot Rooms One A,B,&C (r to l). These threee pot rooms comprise one pot line. There are two such pot lines nearing completion. When the project is completed there will be 8 pot lines or in other words 24 pot rooms, each 1200 feet long.'
Photograph of Potline 2 looking south west from roof of the forge shop. Note purlin clips welded for roof deck. Column forms in place. Concrete being poured for top lift air duct entrance Potroom 2B. Rectified building #102 at right.
Photograph of Potline 2 looking south west from roof of the forge shop. Note purlin clips welded for roof deck. Column forms in place. Concrete being poured for top lift air duct entrance Potroom 2B. Rectified building #102 at right.