Photo showing Potrooms 2c looking northeast, excavation on foreground for main air duct between clumn lines 6 and 7, forms for potroom footing on line M behind southeast corner of Service Building in left background, note vertical cut in compacted backfill.
Photo showing Potrooms 2c looking northeast, excavation on foreground for main air duct between clumn lines 6 and 7, forms for potroom footing on line M behind southeast corner of Service Building in left background, note vertical cut in compacted backfill.
Photo showing potlines 1 and 2 looking south, temporary concrete covers for air duct entrance and manholes in foreground and for footing in background. not transmission line clearing on mountainside.
Photo showing potlines 1 and 2 looking south, temporary concrete covers for air duct entrance and manholes in foreground and for footing in background. not transmission line clearing on mountainside.
8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A
8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A