Photo depicts two workers looking on as a Sikorsky S-55 helicopter brings in a load of supplies to the transmission line camp atop Kildala Pass.
Notes
Photographed by the International Harverster Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.82
Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Notes
Title based on content of photograph. -- Alcan ID No. 2KR-298. -- Permanent housing construction began in 1957. Alcan Collection
Photo depicts two men kneeling beside the first bags of mail to arrive via Pacific Western Airlines. On the right, Captain T. M. Kellough for PWA delivers the bags to on the left, Kitimat Express driver Lloyd Kaberg, at the wharf, Smeltersite. Northern Sentinel Press Collection
Photo depicts two men kneeling beside the first bags of mail to arrive via Pacific Western Airlines. On the right, Captain T. M. Kellough for PWA delivers the bags to on the left, Kitimat Express driver Lloyd Kaberg, at the wharf, Smeltersite. Northern Sentinel Press Collection
Photo showing Columbia Bridge is coming down and will be out of service for about another month according to the municipal engineering department. The old stringers are to be removed Friday and following that the main culvert will be installed and the cavity filled and eventually paved. Kuldo Bridge is to get the same treatment once Columbia is back in use.
Current: 1960s
-District of Kitimat
-Miscellaneous
Scope and Content
Photo showing Columbia Bridge is coming down and will be out of service for about another month according to the municipal engineering department. The old stringers are to be removed Friday and following that the main culvert will be installed and the cavity filled and eventually paved. Kuldo Bridge is to get the same treatment once Columbia is back in use.