Photo depicts miners pouring the permanent crane rail beam along the upstream wall of the powerhouse's A-line. Seen is the special hopper mounted on one of the construction cranes.
Photo depicts miners pouring the permanent crane rail beam along the upstream wall of the powerhouse's A-line. Seen is the special hopper mounted on one of the construction cranes.
Notes
Title based on content of photograph. -- Alcan ID No. KR-1144. -- The special hopper is filled by the concrete pump mounted at the inner end of the access tunnel. Alcan Collection
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Notes
Title based on content of photograph. -- International Harvester Company No. C 6101. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. -- In early July these trucks were waiting for the completion of the batching plant installation. The trucks carried concrete directly to the new smelter in the townsite and assisted in all other town and smelter construction. -- The batch plant was located at "Gravel Mountain" - the sandhill. Hal Whiting Collection 985.65.107
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo depicts workers excavating for the construction of the alumina storage building.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-451. -- Sloping sides avoided cave-ins. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.267
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection