Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Notes
Title based on content of photograph. Part of Board of School Trustees Collection 982.91
Photo depicts buildings at Anderson Hill Camp. Trailers and wash houses are in the foreground. The men's bunkhouses of Anderson Creek Camp are in the background.
Photo depicts buildings at Anderson Hill Camp. Trailers and wash houses are in the foreground. The men's bunkhouses of Anderson Creek Camp are in the background.
Notes
Title based on content of photograph. John Manders Collection
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-846. -- Note progress of conveyor gallery steel, kangaroo crane and pneumatic unloading equipment. Alcan Collection 78.11.68
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo depicts a 5-ton steel ball measuring 8 feet in diameter, strung on a cable and pulled through the forest between two tractors. An unsuccessful experiment.
1 photograph : b&w
1 photograph : b&w ; 25 x 20 cm
Scope and Content
Photo depicts a 5-ton steel ball measuring 8 feet in diameter, strung on a cable and pulled through the forest between two tractors. An unsuccessful experiment.
Notes
Title based on content of photograph. -- Experimental area is being cleared with use of two TD-119 Allis-Chalmers tractors. Alcan Collection 73.3.3.23
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection