Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Stone hammer is grey. Has a groove throughout the circumference of the center, possibly as a hand gripping point or to wrap a binding component around (rope/twine).
Stone hammer is grey. Has a groove throughout the circumference of the center, possibly as a hand gripping point or to wrap a binding component around (rope/twine).