6 Oct 1980
16 Apr 1981
4 May 1981
(3,10) Dec 1981
18 Jan 1982
8 Feb 1982
24 Aug 1982
17 Oct 1982
Physical Description
23 photograph prints : color
19 photograph prints : b&w
27 negatives
Custodial History
Photographs taken by Max Patzelt.
Scope and Content
Photographs showing interior and exterior views of different buildings on the Ocelot site.
Notes
Roll 5-(No5A,No7A,No8A), Roll 12-(No10,No15), Roll 15-No5, 81-12-(596,612,614,620,624), 82-01-702, 82-02-(737,740,743,790 to 793,795,796,801), Roll 33-(12,15,23,25,32,34), Roll 34-11, 82-10-(1176,1183,1187,1194,1195,1200 to 1203,1206,1208,1210,1211)
Photographs showing general ground and aerial shots of the Ocelot methanol plant throughout its construction.
Notes
7357-(13,14,16), 80-6-(008,011), 80-7-(051,052), 80-8-(069,073), 80-9-089, 81-01-(147,148,151), 81-03-(179,183,189,200), 81-04-208, Roll 14-No4, Roll 17-(No8,19), 81-07-(380,381,384), 81-09-(441,443,448,449,450), 81-10-(481 to 485,488,498,503,504,506 to 509), 31-9A, 82-03-(820 to 824), 82-06-(953,954,956,958,963,964), 82-07-(979 to 985), 82-08-(996,1001,1004,1006,1009,1014,1018,1035,1051,1056, 1082 to 1089), 82-09-(1118 to 1124), 82-10-(1165,1167,1168,1191,1192), 85-01-(1317,1325,1330), 85-05-(1350,1353,1354), 85-06-(1355,1356)
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing the earliest construction for the Eurocan Pulp & Paper Mill. Clearing of land and construction of dirt roads can be seen.
Notes
**IMPORTANT NOTE** - Negative slide sleeves are labelled as 2004.16.* , where * represents the item number in each series.
80001, 80003, 80004, 80006, 80011, 80013, 80017, 80045, 80047, 80052, 80054, 80058
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.