Photograph of Northern view of the company's guest houses on Albatross Avenue. One of the Oceanview apartments is visible to the left. In the front right, there is a man working with a pile of material next to him.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of Northern view of the company's guest houses on Albatross Avenue. One of the Oceanview apartments is visible to the left. In the front right, there is a man working with a pile of material next to him.
Photograph of looking southwest showing framing being erected on #5 apartment bldg. in block 56 at Albatross. Please note #7 Apartment bldg. and #1 guest house in background. Men are visible working.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of looking southwest showing framing being erected on #5 apartment bldg. in block 56 at Albatross. Please note #7 Apartment bldg. and #1 guest house in background. Men are visible working.
Photograph of #3 apartment building under construction in block 56. #1 apartment building, which has the first floor framed can be seen on the right hand side of the photograph. Please note paving completed on Oriole Street. There are vehicles on the road, and some people walking down. Acess to oriole is blocked off with barricade.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of #3 apartment building under construction in block 56. #1 apartment building, which has the first floor framed can be seen on the right hand side of the photograph. Please note paving completed on Oriole Street. There are vehicles on the road, and some people walking down. Acess to oriole is blocked off with barricade.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.