Photo showing west end of potroom 2B looking south, showing installation of aluminum roofing, man at left is using Nelson Stud Welder, rectifier building 102 roof at right.
Photo showing west end of potroom 2B looking south, showing installation of aluminum roofing, man at left is using Nelson Stud Welder, rectifier building 102 roof at right.
Photo showing service building roofs of building 156, 155 and 154, looking south east over potline 2, showing temporary covers over passageway buildings and alumina bin foundations.
Photo showing service building roofs of building 156, 155 and 154, looking south east over potline 2, showing temporary covers over passageway buildings and alumina bin foundations.
Photo showing view of the Pan Abode House foundation looking north east showing heating ducts being enclosed in concrete and sewer and water connections being installed.
Photo showing view of the Pan Abode House foundation looking north east showing heating ducts being enclosed in concrete and sewer and water connections being installed.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.