Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
10 slides featuring image of Kitimat in 1980. Slides include images of the Safety Building, hospital, an aerial, Moore Creek waterfall, golf course, centennial park, Lakelse Lake, Alcan Office, and Kitimat River.
10 slides featuring image of Kitimat in 1980. Slides include images of the Safety Building, hospital, an aerial, Moore Creek waterfall, golf course, centennial park, Lakelse Lake, Alcan Office, and Kitimat River.