Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on 23rd of November, after heavy rain and snow. Note the debris on the structure and the part of the bank scoured away. The flow of water cut down the bed of the channel approximately 2' in the area. Man can be seen walking above. Baptist Church in background.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on 23rd of November, after heavy rain and snow. Note the debris on the structure and the part of the bank scoured away. The flow of water cut down the bed of the channel approximately 2' in the area. Man can be seen walking above. Baptist Church in background.
Photograph of the erosion around the ends of the temporary weir in the main channel beside the Baptist Church. Baptist Church is to the right. Some homes visible in background.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of the erosion around the ends of the temporary weir in the main channel beside the Baptist Church. Baptist Church is to the right. Some homes visible in background.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Photo showing Columbia Bridge is coming down and will be out of service for about another month according to the municipal engineering department. The old stringers are to be removed Friday and following that the main culvert will be installed and the cavity filled and eventually paved. Kuldo Bridge is to get the same treatment once Columbia is back in use.
Current: 1960s
-District of Kitimat
-Miscellaneous
Scope and Content
Photo showing Columbia Bridge is coming down and will be out of service for about another month according to the municipal engineering department. The old stringers are to be removed Friday and following that the main culvert will be installed and the cavity filled and eventually paved. Kuldo Bridge is to get the same treatment once Columbia is back in use.
Photograph of Northern view of the company's guest houses on Albatross Avenue. One of the Oceanview apartments is visible to the left. In the front right, there is a man working with a pile of material next to him.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of Northern view of the company's guest houses on Albatross Avenue. One of the Oceanview apartments is visible to the left. In the front right, there is a man working with a pile of material next to him.
Photograph of looking south west in Service Centre showing temporary stores under construction in block 5. Metal framework is up and siding is starting to be built.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of looking south west in Service Centre showing temporary stores under construction in block 5. Metal framework is up and siding is starting to be built.
Photograph of view looking south along Kingfisher Avenue showing the asphalt pavement being completed. Vehicles and people visible on the road further down. Fully built houses, as well as in progress construction are on either side.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of view looking south along Kingfisher Avenue showing the asphalt pavement being completed. Vehicles and people visible on the road further down. Fully built houses, as well as in progress construction are on either side.
Photograph of Service Centre showing the foundation wall formwork for the temporary stores in block 5. One man visible working. Train cars in background.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of Service Centre showing the foundation wall formwork for the temporary stores in block 5. One man visible working. Train cars in background.
Photograph of private homes under construction on Albatross Avenue. Exteriors look mostly complete. Some vehicles on the road, and parked in front of the houses.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of private homes under construction on Albatross Avenue. Exteriors look mostly complete. Some vehicles on the road, and parked in front of the houses.