First alumina boat to discharge alumina for Alcan Smelter in Kitimat - arrived from Port Esquivel, Jamaica, in July 1954. Ship was named S.S. "Sun Karen".
First alumina boat to discharge alumina for Alcan Smelter in Kitimat - arrived from Port Esquivel, Jamaica, in July 1954. Ship was named S.S. "Sun Karen".
Set of 15 slides showing the "Chemistry of Aluminum". Also includes a booklet.
Set of 12 slides showing the "Fabrication of Aluminum". Also includes a booklet.
Set of 15 slides showing the "Chemistry of Aluminum". Also includes a booklet.
Set of 12 slides showing the "Fabrication of Aluminum". Also includes a booklet.
A man playing the accordion at the trade fair opening. There is a large map behind the man, as well as another individual sitting in a chair with a pen in his hand.
1 photograph : b&w ; 10.5 x 12.8 cm
1 negative : b&w ; 9.9 x 12.5 cm
Scope and Content
A man playing the accordion at the trade fair opening. There is a large map behind the man, as well as another individual sitting in a chair with a pen in his hand.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.