View of the gravel fill in place for some of the houses being erected by Hullah construction on Swallow Street. Note the prefabricated forms under erection in centre background.
View of the gravel fill in place for some of the houses being erected by Hullah construction on Swallow Street. Note the prefabricated forms under erection in centre background.
D7 and H3 house. Living room, fireplace and hall leading to entrance hall and bathroom on right, furnace (grill enclosed), two bedrooms to left, and one bedroom at end of hallway.
D7 and H3 house. Living room, fireplace and hall leading to entrance hall and bathroom on right, furnace (grill enclosed), two bedrooms to left, and one bedroom at end of hallway.
Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
Photograph showing concrete being poured and slab finished for the first floor in the No.2 Commercial Building Note : formwork for colums and roof slab in background.
1 photograph :
b&w ; 18 x 12.5 cm
b&w ; 18 x 12.5 cm
Scope and Content
Photograph showing concrete being poured and slab finished for the first floor in the No.2 Commercial Building Note : formwork for colums and roof slab in background.