Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Aerial view of the Kitimat River Bridge site looking East. The townsite camp can be seen at upper right. The building being erected at left centre on the riverbank is the clubhouse of the Kitimat Rod & Gun.
Aerial view of the Kitimat River Bridge site looking East. The townsite camp can be seen at upper right. The building being erected at left centre on the riverbank is the clubhouse of the Kitimat Rod & Gun.