Photograph of aerial of the Alcan, Ocelot, and Eurocan plants. Alcan is on the left with the Kitimat River delta below. Ocelot is to the right, and Eurocan is further to the right.
Photograph of aerial of the Alcan, Ocelot, and Eurocan plants. Alcan is on the left with the Kitimat River delta below. Ocelot is to the right, and Eurocan is further to the right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial view the the Alcan plant and Kitimat River Delta. Alcan plant is visible above while the delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial of the Alcan Plant and Kitimat River Facility. Alcan Plant is visible above and Kitimat River delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial view of the Eurocan, Ocelot, and Alcan docks, as well as the Alcan plant. Kitimat River estuary visible on bottom right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial view of the Eurocan, Ocelot, and Alcan docks, as well as the Alcan plant. Kitimat River estuary visible on bottom right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial view of the Eurocan, Ocelot, and Alcan docks, as well as the Alcan plant. Kitimat River estuary visible on bottom right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of aerial of the Alcan Smelter and Ocelot. Alcan is above on the left with the Kitimat River delta below. Ocelot is on the right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.
Photo showing Carbon Paste Plant area looking north-east showing progress of deep foundations and start of building footings, compressor foundation and column footings for compressor building 140 in foreground.
Photo showing Carbon Paste Plant area looking north-east showing progress of deep foundations and start of building footings, compressor foundation and column footings for compressor building 140 in foreground.
Photo view of quarrying operations along the road between Anderson Creek and the Sandhill showing the loading of rock for use at the permanent wharf area.
Photo view of quarrying operations along the road between Anderson Creek and the Sandhill showing the loading of rock for use at the permanent wharf area.