Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo showing victorious "A" Shift ice hockey team, back row from left: Laurie Leblanc, Jim Adams, Eddy Kratz, Bert Sauteur, Ray LaPointe, Harold Johanson, Denis Marleau, Jerry Chancey. Front row; Gus Ishida, Merv Michaluk, Fred Wowk, Bill Benz, Willy Reid, George Eisner, Kenny Hamanishi, Dolmar Anderson.
Current: 1960s
- Sports
- League Play
- Adult Ice Hockey
Scope and Content
Photo showing victorious "A" Shift ice hockey team, back row from left: Laurie Leblanc, Jim Adams, Eddy Kratz, Bert Sauteur, Ray LaPointe, Harold Johanson, Denis Marleau, Jerry Chancey. Front row; Gus Ishida, Merv Michaluk, Fred Wowk, Bill Benz, Willy Reid, George Eisner, Kenny Hamanishi, Dolmar Anderson.
Photo showing First Ice Hockey Rink built southeast of Nechako Centre by Municipal Staff Members. (L) Lynn Craig; (R) Kim Creed with sticks; (B/G) John Bush, Peter Springer, Nyl Creed, Judy Kreller, Sharon Sestrap, Anne Sheardown.
Northern Sentinel: Box #4: (A) Historical (1) District of Kitimat (a) Recreation - Ice Hockey Rink
Scope and Content
Photo showing First Ice Hockey Rink built southeast of Nechako Centre by Municipal Staff Members. (L) Lynn Craig; (R) Kim Creed with sticks; (B/G) John Bush, Peter Springer, Nyl Creed, Judy Kreller, Sharon Sestrap, Anne Sheardown.
One of the Kitimat minor hockey teams practising on the Kitimat outdoor ice rink. In the background is Squirrel Mountain/Clague Mountain, looking west.
One of the Kitimat minor hockey teams practising on the Kitimat outdoor ice rink. In the background is Squirrel Mountain/Clague Mountain, looking west.
Photo depicts the welcome sign for Kitimat on the wharf that greeted all workers to the Kitimat Project upon their arrival by boat.
Notes
Title based on content of photograph. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.113
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Notes
Title based on content of photograph. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.99
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Notes
Title based on content of photograph. -- Alcan ID Numbers BC-2-243 and ACM-24311. Alcan Collection 78.11.32
Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Notes
Title based on content of photograph. -- International Harvester Company ID No. C 6039. International Harvester Company manufacturerd construction equipment purchased for the Project. -- Dredging at the wharf area provided sufficient water space for large ships to dock. Muck was dumped onto these barges by the clamshell bucket and towed out to deep water. Hal Whiting Collection 985.65.123
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Notes
Title based on content of photograph. Alcan Collection 79.31.7