A drawing of three Alcan employees. The two on the right are men, and the individual on the left is a woman. The lady is holding a trophy (The Gold Quill Award of Excellence) with a feather in it, and there are certificates hanging behind the three workers in the drawing.
A drawing of three Alcan employees. The two on the right are men, and the individual on the left is a woman. The lady is holding a trophy (The Gold Quill Award of Excellence) with a feather in it, and there are certificates hanging behind the three workers in the drawing.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.