Photographs showing general ground and aerial shots of the Ocelot methanol plant throughout its construction.
Notes
7357-(13,14,16), 80-6-(008,011), 80-7-(051,052), 80-8-(069,073), 80-9-089, 81-01-(147,148,151), 81-03-(179,183,189,200), 81-04-208, Roll 14-No4, Roll 17-(No8,19), 81-07-(380,381,384), 81-09-(441,443,448,449,450), 81-10-(481 to 485,488,498,503,504,506 to 509), 31-9A, 82-03-(820 to 824), 82-06-(953,954,956,958,963,964), 82-07-(979 to 985), 82-08-(996,1001,1004,1006,1009,1014,1018,1035,1051,1056, 1082 to 1089), 82-09-(1118 to 1124), 82-10-(1165,1167,1168,1191,1192), 85-01-(1317,1325,1330), 85-05-(1350,1353,1354), 85-06-(1355,1356)
An Aerial view of the Ocelot site. There has yet to be any building construction. The photo shows only the clearing where Ocelot is intended to be built.
An Aerial view of the Ocelot site. There has yet to be any building construction. The photo shows only the clearing where Ocelot is intended to be built.