Photograph of view of Kitimat terminal wharf #1 looking south from a point on conveyor gallery C1 showing the alumina handling plant, and rail being laid on the wharf deck.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view of Kitimat terminal wharf #1 looking south from a point on conveyor gallery C1 showing the alumina handling plant, and rail being laid on the wharf deck.
Photograph of view showing east span of Kitimat River bridge. Note very low water level (elevation 39.9) and recording gauge installed on downstream side of centre pier.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view showing east span of Kitimat River bridge. Note very low water level (elevation 39.9) and recording gauge installed on downstream side of centre pier.
Photograph of view looking southwest from a point north of Kitimat terminal wharf #1 showing hydraulic dredge "townsend" at left, and the wharf Kangaroo Crane being erected at extreme right.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking southwest from a point north of Kitimat terminal wharf #1 showing hydraulic dredge "townsend" at left, and the wharf Kangaroo Crane being erected at extreme right.
Photograph of the council and officials of the municipality of Kitimat, left to right, Mr. D. Hawkins, Works Superintendent, Councillors Baxter, Cronk and Margetts, Mr. C. Mc. Henderson, Municipal Manager, Reeve W.H. Sparks, Miss Y. Mearns, Secretary, Councillors Malby, Davis and Hallman and Mr. L. Wheeldon Treasurer Collector.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of the council and officials of the municipality of Kitimat, left to right, Mr. D. Hawkins, Works Superintendent, Councillors Baxter, Cronk and Margetts, Mr. C. Mc. Henderson, Municipal Manager, Reeve W.H. Sparks, Miss Y. Mearns, Secretary, Councillors Malby, Davis and Hallman and Mr. L. Wheeldon Treasurer Collector.
Photograph of view looking west across the Kitimat River bridge showing the west span erected and bolted, and the lower chord of the east span about halfway across the main channel.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking west across the Kitimat River bridge showing the west span erected and bolted, and the lower chord of the east span about halfway across the main channel.
Photograph of aerial view of the Kitimat River bridge site looking east. The townsite camp can be seen at upper right. The building erected at left centre on the river bank is the clubhouse of the Kitimat Rod & Gun club.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of aerial view of the Kitimat River bridge site looking east. The townsite camp can be seen at upper right. The building erected at left centre on the river bank is the clubhouse of the Kitimat Rod & Gun club.
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.