Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.
Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.
Group photo taken on Aug 3 1951 on occasion of visit of President and Party to South Camp (Nathanael V. Davis, President Aluminum Limited; Mcneely DuBose, VP Alcan; R.E. Powell, President Alcan; Percy E. Radley, British Columbia Project Manager) October 8 1951
1 photograph, b&w ; 17 x 12 cm
1 photograph, b&w ; 24 x 19 cm
Scope and Content
Group photo taken on Aug 3 1951 on occasion of visit of President and Party to South Camp (Nathanael V. Davis, President Aluminum Limited; Mcneely DuBose, VP Alcan; R.E. Powell, President Alcan; Percy E. Radley, British Columbia Project Manager) October 8 1951
Photograph of aerial of the Alcan Smelter and Ocelot. Alcan is above on the left with the Kitimat River delta below. Ocelot is on the right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.