Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photograph of an aerial of the Alcan Smelter and area. Moon Bay area and surrounding service roads are in the front on the left. Estuary is on the right of the Smelter further back. Townsite is beyond that. View extends into mountain ranges of the valley. Sky is cloudy.
Photograph of an aerial of the Alcan Smelter and area. Moon Bay area and surrounding service roads are in the front on the left. Estuary is on the right of the Smelter further back. Townsite is beyond that. View extends into mountain ranges of the valley. Sky is cloudy.
Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
Photograph of a view of the Alcan smelter. Photo is taken from up on a hill with fireweed. View is looking east. Eastuary is visible behind the smelter. Beyond that is the channel and mountains. Low mountains have sections of clearcut. Mount Elizabeth in background.
Photograph of a view of the Alcan smelter. Photo is taken from up on a hill with fireweed. View is looking east. Eastuary is visible behind the smelter. Beyond that is the channel and mountains. Low mountains have sections of clearcut. Mount Elizabeth in background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.
Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.