View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
Photograph of an aerial view the the Alcan plant and Kitimat River Delta. Alcan plant is visible above while the delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of aerial of the Kitimat River Delta, Alcan Plant and part of the Ocelot Operation. Alcan Plant is visible above, Kitimat River Delta below, and Ocelot is to the right.
Photograph of aerial of the Kitimat River Delta, Alcan Plant and part of the Ocelot Operation. Alcan Plant is visible above, Kitimat River Delta below, and Ocelot is to the right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.