Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Notes
Title based on content of photograph. -- Slide No. 40 -- The circus tent assembly line was erected at Vancouver Tug and Barge below the Lion's Gate Bridge. Temporary housing destined for Kitimat was assembled there in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Bill Frahler Collection 2003.32
Fonds consists of 27 slides showing the construction of Alcan Wharf (Caisson Dock Construction) and Kitimat Bridge, 25 slides showing the contruction of Alcan Plant Area, 48 photographs of early construction, 38 slides of early construction. Includes a ruler, ashtray, pie plate and stationery folder.
Art Coghlin was Paymaster for Kitimat Constructors in 1951. He left the company to open Coghlins Hardware in 1954.
Custodial History
Terry Voitchovsky
Scope and Content
Fonds consists of 27 slides showing the construction of Alcan Wharf (Caisson Dock Construction) and Kitimat Bridge, 25 slides showing the contruction of Alcan Plant Area, 48 photographs of early construction, 38 slides of early construction. Includes a ruler, ashtray, pie plate and stationery folder.