Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Notes
Title based on content of photograph. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.99
Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Notes
Title based on content of photograph. -- Slide No. 40 -- The circus tent assembly line was erected at Vancouver Tug and Barge below the Lion's Gate Bridge. Temporary housing destined for Kitimat was assembled there in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Bill Frahler Collection 2003.32
Photo depicts Electrician Bill Frahler's family standing beside his truck. Johnson-Crooks houses under construction in Nechako Neighbourhood are in the background.
Photo depicts Electrician Bill Frahler's family standing beside his truck. Johnson-Crooks houses under construction in Nechako Neighbourhood are in the background.
Notes
Title based on content of photograph. -- "Alva and the Boys", Slide No. 95 -- Bill Frahler wired over 2,000 temporary construction and permanent homes between 1954 and 1958, first working for Johnson-Crooks and then Straits Construction. Bill Frahler Collection 2003.32
Photo depicts workers excavating for the construction of the alumina storage building.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-451. -- Sloping sides avoided cave-ins. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.267
Photo depicts Carl Agar looking up at Bill McLeod who is piloting a Sikorsky helicopter.
Notes
Fourteen Sikorsky S-55 helicopters were used as workhorses and load carriers during construction. Carl Agar and his crew with Okanagan Helicopters took men and materials to otherwise inaccessible spots. Without these helicopters, Project engineers would never have maintained the construction schedule. Photographed by Art Hundert. Kitimat Heritage Advisory Commission Collection
Photo depicts the welcome sign for Kitimat on the wharf that greeted all workers to the Kitimat Project upon their arrival by boat.
Notes
Title based on content of photograph. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.113