Electrician Bill Frahler wired approximately 2000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S.contractors.
View looking northeast showing a group of the prototype houses being erected by Hullah Construction on Pintail and Partridge Streets - Kitimat Townsite.
In Klaus Mueller's possession when Engineering Depart. was dismantled.
Scope and Content
View looking northeast showing a group of the prototype houses being erected by Hullah Construction on Pintail and Partridge Streets - Kitimat Townsite.
Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Notes
Title based on content of photograph. -- Slide No. 40 -- The circus tent assembly line was erected at Vancouver Tug and Barge below the Lion's Gate Bridge. Temporary housing destined for Kitimat was assembled there in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Bill Frahler Collection 2003.32