Skip header and navigation

Revise Search

2 records – page 1 of 1.

Laid off Alcan Employees Returning to Work

https://collections.kitimatmuseum.ca/en/permalink/description9292
Part Of
Max Patzelt fonds
Description Level
Item
GMD
graphic material
Date Range
[ca. 9/12 Sept 1961]
Accession Number
1998.1.8269
Scope and Content
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Part Of
Max Patzelt fonds
Creator
Patzelt, Max
Description Level
Item
Accession Number
1998.1.8269
GMD
graphic material
Date Range
[ca. 9/12 Sept 1961]
Physical Description
1 photograph and 1 negative : b&w
Scope and Content
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Notes
Old Accession No. 987.26.84 A
Name Access
Burr, Eric
Subject Access
Alcan Smelters & Chemicals Ltd.

Caisson launching operation group

https://collections.kitimatmuseum.ca/en/permalink/description148
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
May 15, 1953
Scope and Content
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
142
GMD
graphic material
Date Range
May 15, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Name Access
Hermann, Dick
Jenkinson, Cam
Malby, George
McCallum, Mr.
Van Houten, Mr.
Whiting, Hal
Whitton, J. B.
Wynne-Jones, Mr.
Subject Access
Smeltersite
Alcan Smelters & Chemicals Ltd.
Images