Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
This item is part of a large collection of photographs from Prince Rupert Daily News that was first transfered to the Prince Rupert City & Regional Archives. Images pertaining to Kitimat/Kemano were subsequently transfered to our repository.
Scope and Content
Photograph of new helipad in place on the narrow catwalk on Alcan's catenary system high above the valley in the Kildala Pass.
This item is part of a large collection of photographs from Prince Rupert Daily News that was first transfered to the Prince Rupert City & Regional Archives. Images pertaining to Kitimat/Kemano were subsequently transfered to our repository.
Scope and Content
Photograph of bundles of aluminum cylinder ingots.