Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.
Photo showing general view of the site of Potlines #3 and 4 looking south east, Moore creek channel in foreground and dredge pipe discharging at left centre.
Photo showing general view of the site of Potlines #3 and 4 looking south east, Moore creek channel in foreground and dredge pipe discharging at left centre.
Photo showing steel transformers and other machinery in storage yard during winter with construction offices on site incluidng storage buildings and potrooms.
Photo showing steel transformers and other machinery in storage yard during winter with construction offices on site incluidng storage buildings and potrooms.