Photo showing First Licence Plate (1955). L/R Cyril Henderson, Kitimat's 1st Municipal Manager. 1955 was the first year that cars had to be licenced in Kitimat. 8 December 1955.
Photo showing First Licence Plate (1955). L/R Cyril Henderson, Kitimat's 1st Municipal Manager. 1955 was the first year that cars had to be licenced in Kitimat. 8 December 1955.
Photo showing "Jalopy" stays in Kitimat. Wally Melville buys Creed family's veteran automobile. In car: Wally Melville, wife Grace, daughter Aleta; Aubrey Creed and son Dio to the right.
Photo showing "Jalopy" stays in Kitimat. Wally Melville buys Creed family's veteran automobile. In car: Wally Melville, wife Grace, daughter Aleta; Aubrey Creed and son Dio to the right.
Photo showing car accident. Vehicle charged through 125 feet of brush after losing control off the Alcan Road to the Smeltersite, driven by Mrs. Grace Sheridan
Photo showing car accident. Vehicle charged through 125 feet of brush after losing control off the Alcan Road to the Smeltersite, driven by Mrs. Grace Sheridan
Small engraved pendant made of mixed gold. Roughly rectangular in shape, with a curved top edge; slightly convex. Front depicts (from top to bottom) a sun, canoe, bird (loon?), and a eulachon fish in water. Back has a small loop for a chain.
Small engraved pendant made of mixed gold. Roughly rectangular in shape, with a curved top edge; slightly convex. Front depicts (from top to bottom) a sun, canoe, bird (loon?), and a eulachon fish in water. Back has a small loop for a chain.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.