Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.