Photograph of showing the framing almost completed in Guest House No.2. Two men are visible working on it. Apartments visible behind, and townsite camp is to the left.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of showing the framing almost completed in Guest House No.2. Two men are visible working on it. Apartments visible behind, and townsite camp is to the left.
Photograph of #3 apartment building under construction in block 56. #1 apartment building, which has the first floor framed can be seen on the right hand side of the photograph. Please note paving completed on Oriole Street. There are vehicles on the road, and some people walking down. Acess to oriole is blocked off with barricade.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of #3 apartment building under construction in block 56. #1 apartment building, which has the first floor framed can be seen on the right hand side of the photograph. Please note paving completed on Oriole Street. There are vehicles on the road, and some people walking down. Acess to oriole is blocked off with barricade.
Photograph of looking southwest showing framing being erected on #5 apartment bldg. in block 56 at Albatross. Please note #7 Apartment bldg. and #1 guest house in background. Men are visible working.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of looking southwest showing framing being erected on #5 apartment bldg. in block 56 at Albatross. Please note #7 Apartment bldg. and #1 guest house in background. Men are visible working.
Photograph of view looking west from the Kingfisher Avenue of the B.C. Telephone Building under construction. Brick framework is being placed. A man can be seen wroking in the building. A truck is parker out front to the right.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of view looking west from the Kingfisher Avenue of the B.C. Telephone Building under construction. Brick framework is being placed. A man can be seen wroking in the building. A truck is parker out front to the right.
Photograph of nearly completed B.C. Telephone Exchange building on Kingfisher Avenue. There is a ladder against the outside of the building leading to the roof. Kitimat New Telephone Exchange sign is on the ground leaning against the building. On the right is a vehicle of some sort.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of nearly completed B.C. Telephone Exchange building on Kingfisher Avenue. There is a ladder against the outside of the building leading to the roof. Kitimat New Telephone Exchange sign is on the ground leaning against the building. On the right is a vehicle of some sort.
Photograph of the B.C. Telephone Exchange under construction on Kingfisher Ave. Exterior appears complete. Lots of dirt piles around. Three men are visible out front.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of the B.C. Telephone Exchange under construction on Kingfisher Ave. Exterior appears complete. Lots of dirt piles around. Three men are visible out front.
Photograph of an aerial of the Alcan Smelter and area. Moon Bay area and surrounding service roads are in the front on the left. Estuary is on the right of the Smelter further back. Townsite is beyond that. View extends into mountain ranges of the valley. Sky is cloudy.
Photograph of an aerial of the Alcan Smelter and area. Moon Bay area and surrounding service roads are in the front on the left. Estuary is on the right of the Smelter further back. Townsite is beyond that. View extends into mountain ranges of the valley. Sky is cloudy.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.