Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Postcard featuring an image of a crucible of molten aluminum in the Alcan potlines.
Physical Condition
Good
Material
paper
Height
9cm
Width
14cm
Inscriptions
Kitimat, British Columbia. "The Aluminum City." "ALCAN'S" smelter here has an installed capacity of 260,000 tons annualy in the potline shown. A crucible of molten aluminum is lifted for transport to the casting department. Photo - courtesy Aluminum Co. of Canada, Ltd
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.