Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Kitimat General Hospital : With an ultimat capacity of 219 beds, this magnificent building, costing $3,200,000, was opened March 19th 1960, by the Honorable Eric Martin, Provincial Minister of Health Services and Hospital Insurance.
Kitimat General Hospital : With an ultimat capacity of 219 beds, this magnificent building, costing $3,200,000, was opened March 19th 1960, by the Honorable Eric Martin, Provincial Minister of Health Services and Hospital Insurance.