Kitimat General Hospital : With an ultimat capacity of 219 beds, this magnificent building, costing $3,200,000, was opened March 19th 1960, by the Honorable Eric Martin, Provincial Minister of Health Services and Hospital Insurance.
Kitimat General Hospital : With an ultimat capacity of 219 beds, this magnificent building, costing $3,200,000, was opened March 19th 1960, by the Honorable Eric Martin, Provincial Minister of Health Services and Hospital Insurance.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.